KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  1-11-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Squat Switch Installation Main Gear

Finished up fitting the birch pieces to the gearlatches of the main gear. Bonded it into position with some clamps. More details about the mixture are as usual to be found on the resin tracking sheet
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.